H. N. Ahuja, Construction performance control by networks, 1976.

A. Aloulou, Structure exible d'ordonnancements à performances contrôlées pour le pilotage d'atelier en pr±ence de perturbations, pp.41-42, 2002.

R. N. Anthony, Planning and control systems; a framework for analysis

H. Aytug, M. A. Lawley, K. Mckay, S. Mohan, and R. Uzsoy, Executing production schedules in the face of uncertainties: A review and some future directions, European Journal of Operational Research, vol.161, issue.1, p.86110, 2005.
DOI : 10.1016/j.ejor.2003.08.027

C. Barnhart, E. L. Johnson, G. L. Nemhauser, M. W. Savelsbergh, and P. H. Vance, Branch-and-Price: Column Generation for Solving Huge Integer Programs, Operations Research, vol.46, issue.3, p.316329, 1998.
DOI : 10.1287/opre.46.3.316

K. Bart, Fuzziness vs. probability. International journal of general systems, p.211240, 1990.

C. Baudrit, Représentation et propagation de connaissances imprécises et incertaines: Application à l'évaluation des risques liés aux sites et aux sols pollués, 2005.

C. Baudrit, D. Dubois, and D. Guyonnet, Joint Propagation and Exploitation of Probabilistic and Possibilistic Information in Risk Assessment, IEEE Transactions on Fuzzy Systems, vol.14, issue.5, pp.593607-2006
DOI : 10.1109/TFUZZ.2006.876720

J. Bidot, A General Framework Integrating Techniques for Scheduling under Uncertainty, pp.32-41, 2005.

J. Billaut, A. Moukrim, and E. Sanlaville, Introduction à la fexibilité et à la robustesse en ordonnancement, Flexibilité et Robustesse en Ordonnancement, p.1332, 2005.

F. Fayer and . Boctor, Some ecient multi-heuristic procedures for resourceconstrained project scheduling, European Journal of Operational Research, vol.49, issue.1, p.313, 1990.

P. Bonnal, D. Gourc, and G. Lacoste, Where do we stand with fuzzy project scheduling? Journal of construction engineering and management, p.114123, 2004.

R. Tyson, A. A. Browning, and . Yassine, Resource-constrained multi-project scheduling: Priority rule performance revisited, International Journal of Production Economics, vol.126, issue.2, pp.212228-62, 2010.

W. Chan, D. K. Chua, and G. Kannan, Construction Resource Scheduling with Genetic Algorithms, Journal of Construction Engineering and Management, vol.122, issue.2, p.125132, 1996.
DOI : 10.1061/(ASCE)0733-9364(1996)122:2(125)

S. Chanas, D. Dubois, and P. Zielinski, On the sure criticality of tasks in activity networks with imprecise durations, IEEE Transactions on Systems, Man and Cybernetics, Part B (Cybernetics), vol.32, issue.4, pp.393407-393433, 2002.
DOI : 10.1109/TSMCB.2002.1018760

C. Shu-jen-chen and . Hwang, Fuzzy multiple attribute decision making: Methods and applications. Fuzzy sets, p.35, 1992.

S. Qinghong and C. , Comparing probabilistic and fuzzy et approaches for designing in the presence of uncertainty, 2000.

J. Andrew, J. Davenport, and . Beck, A survey of techniques for scheduling with uncertainty, USENIX Technical Conference, pp.41-42, 2000.

. Ronald-de-boer, Resource-constrained Multi-Project Management -A Hierarchical Decision Support System, BETA Institute for Business Engineering and Technology application, vol.15, issue.49, pp.62-63, 1998.

L. Erik, W. S. Demeulemeester, and . Herroelen, Project scheduling: A research Handbook, 2002.

G. Dimitri, On the distribution of activity time in pert, The Journal of the Operational Research Society, vol.39, issue.8, p.767771, 1988.

R. Djeridi, Contribution à la maîtrise de la disponibilité de systèmes complexes : Proposition d'une méthode de réordonnancement proactif de la maintenance. PhD thesis, l'Ecole Nationale Supérieure d'Arts et Métiers, 2010.

A. Drira, H. Pierreva, and S. Hajri-gabouj, Degradation of the available information over time in layout design: a fuzzy evolutionary approach, International Conference on Industrial Engineering and Systems Management, p.100, 2011.

D. Dubois and H. Prade, The mean value of a fuzzy number. Fuzzy Sets and Systems, p.279300, 1987.

D. Dubois and H. Prade, Possibility theory: an approach to computerized processing of uncertainty, International Journal of General Systems, pp.35-43, 1988.

D. Dubois and H. Prade, Fuzzy sets and probability: misunderstandings, bridges and gaps, [Proceedings 1993] Second IEEE International Conference on Fuzzy Systems, p.10591068, 1993.
DOI : 10.1109/FUZZY.1993.327367

URL : http://citeseerx.ist.psu.edu/viewdoc/summary?doi=10.1.1.45.3581

D. Dubois and H. Prade, Représentations formelles de l'incertain et de l'imprécis, Concepts et méthodes pour l'aide à la décision, outils de modélisation, Traité IC2, p.111171, 2006.

D. Dubois, H. Prade, and S. Sandri, On Possibility/Probability Transformations, Proceedings of Fourth IFSA Conference, p.103112, 1993.
DOI : 10.1007/978-94-011-2014-2_10

D. Dubois, H. Fargier, and H. Prade, Fuzzy constraints in jobshop scheduling, Journal of Intelligent Manufacturing, vol.6, issue.4, p.215234, 1995.

D. Dubois, H. Fargier, and V. Galvagnon, On latest starting times and oats in activity networks with ill-known durations, European Journal of Operational Research, vol.147, issue.89, pp.266280-266323, 2003.

D. Dubois, H. Fargier, and J. Fortin, Computational methods for determining the latest starting times and oats of tasks in interval-valued activity networks, Journal of Intelligent Manufacturing, vol.16, p.407421, 2005.

M. Said and . Easa, Resource leveling in construction by optimization, Journal of Construction Engineering and Management ASCE, vol.115, issue.85, pp.302316-302341, 1989.

E. Salah and . Elmaghraby, Contribution to the round table discussion on new challenges in project scheduling, PMS Conference, p.24, 2002.

A. Fabricius, Maintenance planning and control tools Master's thesis, College of aeronautics air transport group, 2003.

H. Fargier and C. Thierry, The use of possibilistic decision theory in manufacturing planning and control, recent results in fuzzy master production, Scheduling in Scheduling under Fuzziness, p.4559, 2000.

F. Bruno-de, Theory of Probability: A Critical Introductory Treatment

G. Groupe, Flexibilité et robustesse en ordonnancement, 2002.

P. Fortemps, Jobshop scheduling with imprecise durations: a fuzzy approach, IEEE Transactions on Fuzzy Systems, vol.5, issue.4, p.557569, 1997.
DOI : 10.1109/91.649907

J. Fortin, P. Zielinski, D. Dubois, and H. Fargier, Interval Analysis in Scheduling, Principles and Practice of Constraint Programming -CP 2005, pp.226240-226283, 2005.
DOI : 10.1007/11564751_19

N. Gademann and M. Schutten, Linear-programming-based heuristics for project capacity planning, IIE Transactions, vol.37, issue.2, pp.153165-153183, 2005.
DOI : 10.1016/0263-7863(94)90016-7

M. M. Giebels, EtoPlan a concept for concurrent manufacturing planning and control, 2000.

M. Glade, Modélisation des coûts de cycle de vie : prévision des coûts de maintenance et de la abilité, Application à l'aéronautique, 2005.

E. David and . Goldberg, Genetic Algorithms in Search, Optimization and Machine Learning, 1989.

M. Eliyahu and . Goldratt, Critical Chain. The North River Press, 1997.

D. Golenko-ginzburg, On the distribution of activity time in pert, The Journal of the Operational Research Society, vol.39, issue.8, p.767771, 1988.

B. Grabot, L. Geneste, G. R. Castillo, and S. Vérot, Integration of uncertain and imprecise orders in the MRP method, Journal of Intelligent Manufacturing, vol.25, issue.1, pp.215234-215277, 2005.
DOI : 10.1007/s10845-004-5890-x

L. Alfred, R. Guirida, and . Nagi, Fuzzy set theory applications in production management research: a literature survey, Journal of Intelligent Manufacturing, vol.9, issue.1, p.3956, 1998.

R. Guillaume, C. Thierry, and B. Grabot, Modelling of illknown requirements and integration in production planning, Production Planning & Control, vol.22, issue.4, p.336352, 2011.
URL : https://hal.archives-ouvertes.fr/hal-00952725

R. A. Hahn and A. M. Newman, Scheduling united states coast guard helicopter deployment and maintenance at clearwater air station, orida, Computers and Operations Research, vol.35, issue.6, p.18291843, 2008.

E. W. Hans, Resource Loading by Branch-and-Price Techniques, pp.52-53, 2001.

E. W. Hans, W. Herroelen, R. Leus, and G. Wullink, A hierarchical approach to multi-project planning under uncertainty, Omega, vol.35, issue.5, pp.563577-563596, 2007.
DOI : 10.1016/j.omega.2005.10.004

M. Hapke and R. Slowinski, Fuzzy priority heuristics for project scheduling, Fuzzy Sets and Systems, vol.83, issue.3
DOI : 10.1016/0165-0114(95)00338-X

M. Hapke and R. Slowinski, A DSS for resource constrained project scheduling under uncertainty, Journal of Decision Systems, vol.2, issue.2, p.111117, 1993.

M. Hapke, A. Jaszkiewicz, and R. Slowinski, Fuzzy project scheduling system for software development. Fuzzy Sets and Systems, p.101117, 1994.

R. B. Harris, Packing method for resource leveling (pack) ASCE, Journal of Construction Engineering and Management, vol.116, issue.2, p.331350, 1990.

S. Hartmann and D. Briskorn, A survey of variants and extensions of the resource-constrained project scheduling problem, European Journal of Operational Research, vol.207, issue.1, p.114, 2010.
DOI : 10.1016/j.ejor.2009.11.005

W. Herroelen and R. Leus, Project scheduling under uncertainty: Survey and research potentials, European Journal of Operational Research, vol.165, issue.2, p.289306, 2005.
DOI : 10.1016/j.ejor.2004.04.002

W. S. Herroelen, Project and production scheduling. acco, pp.25-26, 2007.

F. S. Hillier, Stochastic project scheduling. International Series in Operations Research & Management Science, p.535591, 2002.

J. H. Holland, Outline for a Logical Theory of Adaptive Systems, Journal of the ACM, vol.9, issue.3, p.297314, 1962.
DOI : 10.1145/321127.321128

L. A. Ika, Analyse de la valeur acquise en contexte d'interdépendance des chemins : une avenue à explorer, Actes du Congrès de l'association canadienne des sciences administratives (ASAC), Recherche opérationnelle, p.26, 2004.

M. Inuiguchi, M. Sakawa, and Y. Kume, The usefulness of possibilistic programming in production planning problems, International Journal of Production Economics, vol.33, issue.1-3, p.4552, 1994.
DOI : 10.1016/0925-5273(94)90117-1

J. Kim, K. Kim, N. Jee, and Y. Yoon, Enhanced Resource Leveling Technique for Project Scheduling, Journal of Asian Architecture and Building Engineering, vol.4, issue.2, pp.461466-461489, 2005.
DOI : 10.3130/jaabe.4.461

K. Kim, Y. Yun, J. Yoon, M. Gen, and G. Ya-mazaki, Hybrid genetic algorithm with adaptive abilities for resourceconstrained multiple project scheduling, Computers in Industry, vol.56, issue.2, p.143160, 2005.

A. Harry and . Kinnison, Aviation Maintenance Management, 2004.

S. Kirkpatrick, C. D. Gelatt, and M. P. Vecchi, Optimization by simulated annealing, Science, vol.220, issue.63, pp.671680-671708, 1983.

T. Kis, A branch-and-cut algorithm for scheduling of projects with variable-intensity activities, Mathematical Programming, vol.136, issue.3, p.515539, 2005.
DOI : 10.1007/s10107-004-0551-6

R. Kolish and S. Hartmann, Heuristic algorithms for solving the resource-constrained project scheduling problem: Classication and computational analysis Project scheduling: recent models, algorithms and applications, pp.27-91, 1999.

L. Hoang-trung, Utilisation d'ordres partiels pour la caractérisation de solutions robustes en ordonnancement, 2005.

. Sou-sen, A. Leu, C. Chen, and . Yang, A fuzzy optimal model for construction resource leveling scheduling, Canadian Journal of Civil Engineering, vol.26, issue.44, pp.673684-673710, 1999.

. Sou-sen, C. Leu, J. Yang, and . Huang, Resource leveling in construction by genetic algorithm-based optimization and its decision support system application. Automation in Construction, p.2741, 2000.

R. Leus, The generation of stable project plans, Complexity and Exact Algorithms, pp.34-42, 2003.

B. Liu and Y. Liu, Expected value of fuzzy variable and fuzzy expected value models, IEEE Transactions on Fuzzy Systems, vol.10, issue.4, pp.445-450, 2002.

F. A. Lootsma, Stochastic and fuzzy Pert, European Journal of Operational Research, vol.43, issue.2, pp.174-183, 1989.
DOI : 10.1016/0377-2217(89)90211-7

R. Kenneth, C. A. Maccrimmon, and . Ryavec, An analytical study of the pert assumptions, Operations Research, vol.12, issue.1, p.1637, 1964.

K. Macleod and P. F. Petersen, Estimating the tradeo between resource allocation and probability of on time completion in project management, Project Management Journal, vol.27, issue.1, pp.2633-2646, 1996.

F. Marmier, Contribution à l'ordonnancement des activit± de maintenance sous contrainte de compétence: une approche dynamique, proactive et multicritère, 2007.

M. Masmoudi and A. Haït, A tactical model under uncertainty for helicopter maintenance planning, the 8th ENIM IFAC International Conference of Modeling and Simulation, MOSIM'10, pp.1837-1845, 2010.

M. Masmoudi and A. Haït, Fuzzy capacity planning for an helicopter maintenance center, International Conference on Industrial Engineering and Systems Management, pp.44-45, 2011.
URL : https://hal.archives-ouvertes.fr/hal-00679930

M. Masmoudi and A. Haït, A GA-based fuzzy resource leveling optimization for helicopter maintenance activity, Proceedings of the 7th conference of the European Society for Fuzzy Logic and Technology (EUSFLAT-2011)
DOI : 10.2991/eusflat.2011.90

M. Masmoudi and A. Hait, Introduction à la maintenance aéronautique, 2011.

M. Masmoudi, E. Hans, and A. Haït, Fuzzy tactical project planning: Application to helicopter maintenance, ETFA2011, pp.24-44, 2011.
DOI : 10.1109/ETFA.2011.6059048

D. Daniel and . Mattioda, Use of critical chain scheduling to increase aircraft availability . Master's thesis, Air Force Institute of Technology, 2002.

G. Mauris, A Comparison of Possibility and Probability Approaches for Modelling Poor Knowledge on Measurement Distribution, 2007 IEEE Instrumentation & Measurement Technology Conference IMTC 2007, p.15, 2007.
DOI : 10.1109/IMTC.2007.379075

V. Sanjay, R. Mehta, and . Uzsoy, Predictable scheduling of a single machine subject to breakdowns, International Journal of Computer Integrated Manufacturing, vol.12, issue.1, p.1538, 1999.

R. H. Mohring, Minimizing costs of resource requirements in project networks subject to a xed completion time, Operations Research, vol.3289, issue.120, 1984.

S. Nakajima, Introduction to TPM, 1989.

E. Nikolaidis, S. Chen, H. Cudney, R. T. Haftka, and R. Rosca, Comparison of probability and possibility for design against Bibliography catastrophic failure under uncertainty, Journal of Mechanical Design, vol.126, issue.3, p.386394, 2004.

R. and G. Parker, Deterministic scheduling Theory, 1995.

P. Pongcharoen, C. Hicks, P. M. Braiden, and D. J. Stewardson, Determining optimum Genetic Algorithm parameters for scheduling the manufacturing and assembly of complex products, International Journal of Production Economics, vol.78, issue.3, p.311322, 2002.
DOI : 10.1016/S0925-5273(02)00104-4

H. Rommelfanger, Fulpal ??? An Interactive Method for Solving (Multiobjective) Fuzzy Linear Programming Problems, Stochastic versus Fuzzy Approaches to Multiobjective Mathematical Programming under Uncertainty, Lecture Notes in Computer Science
DOI : 10.1007/978-94-009-2111-5_14

L. Sanchez, I. Couso, and J. Casillas, Genetic learning of fuzzy rules based on low quality data. Fuzzy Sets and Systems, p.25242552, 2009.

A. Sgaslink, Planning german army helicopter maintenance and mission assignment. Master's thesis, Naval Postgraduate School, California, 1994.

V. Shankar, A Flexible Optimization Approach to Multi-Resource, Multi- Project Planning and Scheduling, 1996.

R. Slowinski and M. Hapke, Scheduling under Fuzziness, 2000.

X. Song and S. Petrovic, A fuzzy approach to capacitated ow shop scheduling, the 11th International Conference on Information Processing and Management of Uncertainty in Knowledge-based Systems, IPMU, p.486493, 2006.

C. Subhash, L. Balaji-nagarajan-sarin, and . Liao, Stochastic Scheduling -Expectation-Variance Analysis Of A Schedule, pp.60-61, 2010.

E. Talbi, Metaheuristics: from design to implementation, 2009.
DOI : 10.1002/9780470496916

URL : https://hal.archives-ouvertes.fr/hal-00750681

P. Tannery and C. Henry, Oeuvres de Fermat, p.1894

P. Thenaisie, Annexe technique du projet hélimaintenance R&D1, 2005.

J. M. Peter, E. H. Van-laarhoven, J. K. Aarts, and . Lenstra, Job shop scheduling by simulated annealing, Operations Research, vol.40, issue.1, pp.113-125, 1992.

. Watanabe, Job-shop scheduling using fuzzy logic in a computer integrated manufacturing environment, the 5th International Conference on Systems Research, Informatics and Cybernetics, 1990.

K. Bo, V. S. Wong, and . Lai, A survey of the application of fuzzy set theory in production and operations management: 1998-2009, International Journal of Production Economics, vol.129, issue.1, p.157168, 2011.

G. Wullink, Resource Loading Under Uncertainty, pp.22-49, 2005.

G. Wullink, A. J. Gademann, E. W. Hans, and A. Van-harten, A scenario based approach for exible resource loading under uncertainty, International Journal of Production Research, vol.42, issue.24, p.50795098, 2004.

L. Zadeh, Fuzzy sets Information and Control, p.338353, 1965.

L. Zadeh, Fuzzy sets as basis for a theory of possibility. Fuzzy sets and systems, p.328, 1978.

A. Lot and . Zadeh, Discussion, The Journal of Prosthetic Dentistry, vol.2, issue.5, p.271276, 1995.
DOI : 10.1016/S0022-3913(52)80044-7