K. Et-renn-]-klinke, A. Et-renn, and O. , A new approach to risk evaluation and management : Risk-based, precaution-based, and discourse-based strategies, Risk Analysis, issue.6, pp.22-1071, 2002.

S. Ladany, Optimal Use of Control Charts for Controlling Current Production, Management Science, vol.19, issue.7, pp.763-772, 1973.
DOI : 10.1287/mnsc.19.7.763

M. A. Lewis, Cause, consequence and control: towards a theoretical and practical model of operational risk, Journal of Operations Management, vol.21, issue.2, pp.205-224, 2003.
DOI : 10.1016/S0272-6963(02)00071-2

S. Lieberman, G. J. Lieberman, and H. Et-solomon, Multi-Level Continuous Sampling Plans, The Annals of Mathematical Statistics, vol.26, issue.4, pp.686-704, 1955.
DOI : 10.1214/aoms/1177728428

URL : http://projecteuclid.org/download/pdf_1/euclid.aoms/1177728428

L. Chou-]-lin, Y. Et-chou, and C. , On the design of variable sample size and sampling intervals <mml:math altimg="si1077.gif" overflow="scroll" xmlns:xocs="http://www.elsevier.com/xml/xocs/dtd" xmlns:xs="http://www.w3.org/2001/XMLSchema" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xmlns="http://www.elsevier.com/xml/ja/dtd" xmlns:ja="http://www.elsevier.com/xml/ja/dtd" xmlns:mml="http://www.w3.org/1998/Math/MathML" xmlns:tb="http://www.elsevier.com/xml/common/table/dtd" xmlns:sb="http://www.elsevier.com/xml/common/struct-bib/dtd" xmlns:ce="http://www.elsevier.com/xml/common/dtd" xmlns:xlink="http://www.w3.org/1999/xlink" xmlns:cals="http://www.elsevier.com/xml/common/cals/dtd"><mml:mover accent="true"><mml:mrow><mml:mi>X</mml:mi></mml:mrow><mml:mrow><mml:mo>??</mml:mo></mml:mrow></mml:mover></mml:math> charts under non-normality, International Journal of Production Economics, vol.96, issue.2, pp.249-261, 2005.
DOI : 10.1016/j.ijpe.2004.05.001

. Linderman, An integrated systems approach to process control and maintenance, European Journal of Operational Research, vol.164, issue.2, pp.324-340, 2005.
DOI : 10.1016/j.ejor.2003.11.026

. Lindsay, . Bishop, G. F. Lindsay, and A. B. Bishop, Allocation of Screening Inspection Effort???A Dynamic-Programming Approach, Management Science, vol.10, issue.2, pp.342-352, 1964.
DOI : 10.1287/mnsc.10.2.342

. Liu, Optimal coordinate sensor placements for estimating mean and variance components of variation sources, IIE Transactions, vol.31, issue.9, pp.877-889, 2005.
DOI : 10.1109/TRA.2003.808852

V. Lorenzen, T. J. Lorenzen, and L. C. Vance, The Economic Design of Control Charts: A Unified Approach, Technometrics, vol.15, issue.1, pp.3-10, 1986.
DOI : 10.1080/00401706.1986.10488092

H. Luss, Maintenance Policies When Deterioration Can be Observed by Inspections, Operations Research, vol.24, issue.2, pp.359-366, 1976.
DOI : 10.1287/opre.24.2.359

. Mandroli, A survey of inspection strategy and sensor distribution studies in discrete-part manufacturing processes, IIE Transactions, vol.32, issue.4, pp.309-328, 2006.
DOI : 10.1109/TRA.2003.808852

H. Markowitz, PORTFOLIO SELECTION*, The Journal of Finance, vol.7, issue.1, pp.77-91, 1952.
DOI : 10.1111/j.1540-6261.1952.tb01525.x

. Mccormack, CAPABILITY INDICES FOR NON-NORMAL DATA, Quality Engineering, vol.24, issue.4, pp.489-495, 2000.
DOI : 10.1080/03610919108812950

. Mili, Dynamic risk management unveil productivity improvements, Journal of Loss Prevention in the Process Industries, pp.25-34, 2009.
DOI : 10.1016/j.jlp.2008.07.011

D. C. Montgomery, Introduction to Staistical Quality Control, 2005.

N. Et-khan-]-narahari, Y. Et-khan, and L. M. , Modeling reentrant manufacturing systems with inspection stations, Journal of Manufacturing Systems, vol.15, issue.6, pp.367-378, 1996.
DOI : 10.1016/S0278-6125(97)83051-8

J. Oakland, Statistical process control, 2007.

T. Onoufriou, Reliability based inspection planning of offshore structures, Marine Structures, vol.12, issue.7-8, pp.521-539, 1999.
DOI : 10.1016/S0951-8339(99)00030-1

V. Ozouf, Comment conserver un niveau de risques acceptable dans un contexte de conception / industrialisation de plus en plus rapide d'un produit de plus en plus complexe ?, 2009.
URL : https://hal.archives-ouvertes.fr/tel-00450032

. Ozouf, . Pillet, V. Ozouf, and M. Pillet, Build your control plan in a design to risk objective -a new way to use Process FMEA Optimal continuous-wear limit replacement under periodic inspections. Reliability, 19th International conference on production research -ICPR19, pp.97-102, 1988.

M. Pillet, Appliquer la maîtrise statistique des processus (MSP/SPC) Éditions d'Organisation, 2005.

. Pillet, La matrice d'impact pour construire un plan de surveillance avec les contraintes de l'ingénierie simultanée, 2007.

P. Et-angelus-]-porteus, E. Et-angelus, and A. , Opportunities for improved statistical process control, Management Science, pp.1214-1228, 1997.

C. Rau, H. Rau, and K. Et-cho, Genetic algorithm modeling for the inspection allocation in reentrant production systems, Expert Systems with Applications, vol.36, issue.8, pp.11287-11295, 2009.
DOI : 10.1016/j.eswa.2009.03.020

. Rau, Layer modelling for the inspection allocation problem in re-entrant production systems, International Journal of Production Research, vol.36, issue.17, pp.43-3633, 2005.
DOI : 10.1080/00207548708919925

T. Raz, A survey of models for allocating inspection effort in multistage production systems, Journal of quality technology, pp.239-247, 1986.

. Rebello, Specialized inspection problems in serial production systems, European Journal of Operational Research, vol.80, issue.2, pp.277-296, 1995.
DOI : 10.1016/0377-2217(94)00171-8

. Rohleder, T. R. Silver-]-rohleder, and E. A. Et-silver, Statistical process control subject to a labour resource constraint, International Journal of Production Research, vol.27, issue.14, pp.40-3337, 2002.
DOI : 10.1080/002075499191832

W. A. Schippers, An integrated approach to process control, International Journal of Production Economics, vol.69, issue.1, pp.93-105, 2001.
DOI : 10.1016/S0925-5273(98)00243-6

. Shamsuzzaman, Strandard SEMI E133 : Provisional standard for automated process control systems interface. Semiconductor Equipment and Materials Int Designs of ¯ x&s control charts with optimal manpower deployment, 2007.

J. G. Shanthikumar, Effects of capture rate and its repeatability on optimal sampling requirements in semiconductor manufacturing, 2007 International Symposium on Semiconductor Manufacturing, pp.1-6, 2007.
DOI : 10.1109/ISSM.2007.4446897

. Shetwan, Allocation of quality control stations in multistage manufacturing systems, Computers & Industrial Engineering, vol.60, issue.4, pp.473-484, 2011.
DOI : 10.1016/j.cie.2010.12.022

W. Shewhart, Economic control of quality of manufactured product, 1931.

Y. Shiau, Inspection resource assignment in a multistage manufacturing system with an inspection error model, International Journal of Production Research, vol.13, issue.8, pp.40-1787, 2002.
DOI : 10.1080/00207548708919925

. Silver, . Rohleder, E. A. Silver, and T. R. Et-rohleder, The economic design of an x control chart recognizing process improvement Optimal inspection and maintenance policies for infrastructure networks, ) : 393. [Smilowitz et Madanat, pp.5-13, 1999.

K. S. Stephens, How to perform continuous sampling (CSP), 1986.

. Stoumbos, The State of Statistical Process Control as We Proceed into the 21st Century, Journal of the American Statistical Association, vol.31, issue.451, pp.95-992, 2000.
DOI : 10.1016/S0362-546X(97)00013-8

Z. G. Stoumbos, Process capability indices: overview and extensions, Nonlinear Analysis: Real World Applications, vol.3, issue.2, pp.191-210, 2002.
DOI : 10.1016/S1468-1218(01)00022-0

. Straub, . Faber, D. Straub, and M. H. Et-faber, Risk based inspection planning for structural systems, Structural Safety, vol.27, issue.4, pp.335-355, 2005.
DOI : 10.1016/j.strusafe.2005.04.001

G. Szegö, Measures of risk, European Journal of Operational Research, vol.163, issue.1, pp.5-19, 2005.
DOI : 10.1016/j.ejor.2003.12.016

G. Tagaras, A survey of recent developments in the design of adaptive control charts, Journal of quality technology, vol.30, issue.3, pp.212-231, 1998.

. Tixier, Review of 62 risk analysis methodologies of industrial plants, Journal of Loss Prevention in the Process Industries, pp.291-303, 2002.
DOI : 10.1016/S0950-4230(02)00008-6

URL : https://hal.archives-ouvertes.fr/ineris-00961858

. Tsung, . Shi, F. Tsung, and J. Et-shi, Integrated design of run-to-run PID controller and SPC monitoring for process disturbance rejection, IIE Transactions, vol.23, issue.6, pp.31-517, 1999.
DOI : 10.2307/1269551

G. Vining, Technical Advice: Statistical Process Control and Automatic/Engineering Process Control, Quality Engineering, vol.22, issue.3, pp.222-224, 2010.
DOI : 10.1080/08982111003800547

W. Wang, A model to determine the optimal critical level and the monitoring intervals in condition-based maintenance, International Journal of Production Research, vol.38, issue.6, pp.1425-1436, 2000.
DOI : 10.1080/002075400188933

W. Wang, Modelling condition monitoring intervals: A hybrid of simulation and analytical approaches, Journal of the Operational Research Society, vol.51, issue.3, pp.273-282, 2003.
DOI : 10.1007/978-1-4471-0777-4_25

W. Wang, Y. M. Et-nagarkar, and S. R. , Locator and Sensor Placement for Automated Coordinate Checking Fixtures, Journal of Manufacturing Science and Engineering, vol.121, issue.4, pp.709-719, 1999.
DOI : 10.1115/1.2833116

W. Woodall, Control charts based on attribute data : bibliography and review, Journal of Quality Technology, vol.29, issue.2, pp.172-183, 1997.

W. H. Woodall, Research issues and ideas in statistical process control, Journal of Quality Technology, pp.376-386, 1999.

. Woodall, Weaknesses of the Economic Design of Control Charts, Technometrics, vol.28, issue.4, pp.408-410, 1986.
DOI : 10.2307/1269000

. Worden, . Burrows, K. Worden, and A. Burrows, Optimal sensor placement for fault detection, Engineering Structures, vol.23, issue.8, pp.885-901, 2001.
DOI : 10.1016/S0141-0296(00)00118-8

. Wu, An overview of theory and practice on process capability indices for quality assurance, International Journal of Production Economics, vol.117, issue.2, pp.338-359, 2009.
DOI : 10.1016/j.ijpe.2008.11.008

. Wu, Designs of control charts with optimal manpower deployment, International Journal of Production Research, vol.31, issue.11, pp.2119-2132, 2006.
DOI : 10.1080/07408170490426152

. Du and . Bettayeb, Quality and exposure control in semiconductor manufacturing. Part I : Modelling, International Journal of Production Research, p.10630042, 1080.

. Bettayeb, Quality and exposure control in semiconductor manufacturing, 2011.
URL : https://hal.archives-ouvertes.fr/hal-00677042

. Sahnoun, Smart sampling for risk reduction and delay optimisation, 2012 IEEE International Systems Conference SysCon 2012, pp.19-22, 2012.
DOI : 10.1109/SysCon.2012.6189485

URL : https://hal.archives-ouvertes.fr/hal-00685926

. Bettayeb, Plan de surveillance basé sur l'exposition aux risques et les capabilités des ressources, 9ème Congrès International de Génie Industriel (CIGI2011), pp.10-14, 2011.

. Sahnoun, Impact of Sampling on W@R and Metrology Time delay, Intel European Research & Innovation Conference (ERIC2011), pp.12-14, 2011.
URL : https://hal.archives-ouvertes.fr/hal-00685922

. Bettayeb, Plan de surveillance basé sur l'exposition aux risques et les aptitudes des ressources, 4èmes Journées Doctorales/Journées Nationales MACS (JD-JN-MACS'11), pp.9-10, 2011.

. Bettayeb, An approach for operational risk evaluation and its link to control plan, 13th ARCSIS Technical & Scientific Meeting, Manufacturing Challenges in European semiconductor fabs (ARCSIS010), p.18, 2010.

. Bettayeb, Optimized design of control plans based on risk exposure and resources capabilities, IEEE Conference publications of International Symposium on Semiconductor Manufacturing (ISSM2010), pp.18-20, 2010.
URL : https://hal.archives-ouvertes.fr/hal-00579882

. Bettayeb, An improved branch-and-bound algorithm to minimize the weighted flowtime on, 2008.
URL : https://hal.archives-ouvertes.fr/hal-00706234